RedmineCRM Theme

RedmineCRM theme is freshly designed, open and responsive Redmine and RedmineCRM plugins theme with fixed 960px width, top menu panel and...
Redmine Theme Gallery
View the embedded image gallery online at:
http://www.redminethemes.org/redmine-themes/redminecrm-theme#sigProId182ac4e862
http://www.redminethemes.org/redmine-themes/redminecrm-theme#sigProId182ac4e862


