Redmine
themes
Your Redmine themes guide
Redmine Themes
Menu
Redmine Themes
Axiom Theme
Axiom Theme
Basic Info
Rating
Axiom is a low-toned (dark) with green highlights.
Redmine Theme Gallery
View the embedded image gallery online at:
http://www.redminethemes.org/redmine-themes/axiom-theme#sigProIdb6605b6e08
3.15
1
1
1
1
1
1
1
1
1
1
Rating 3.15 (10 Votes)
Version:
Free
Author:
Dave Hulihan
Compatible with:
2.0.x - 3.1.x
Latest release:
11-01-2013
Mobile friendly:
No
Registration required:
No