A1 Theme

A freshly designed, open and responsive Redmine and RedmineCRM plugins theme with a featured header blocks, tags and status badges...
Redmine Theme Gallery
View the embedded image gallery online at:
http://www.redminethemes.org/redmine-themes/a1-theme#sigProId4e8dbff59f
http://www.redminethemes.org/redmine-themes/a1-theme#sigProId4e8dbff59f


